ST. LOUIS (AP) — More repairs have been made to the concrete surface of the Stan Musial Veterans Memorial Bridge in St. Louis. KMOX reports (http://cbsloc.al/1hvd64z ) several areas of the bridge were resurfaced because the top 2 inches of the concrete/latex mix didn't bond to the 10-inch concrete underdeck. Missouri transportation department director Randy Hitt says the repairs were to about 8 square feet of the nearly 30,000 square feet of the deck on the main bridge.
Reported by SeattlePI.com 3 hours ago.
↧